Maintenance for New Systems
Keeping a new home’s system clean and performing to its startup readings.
Builders & Custom Homes
Mechanical design, rough-in, equipment setting and commissioning for new residential construction, coordinated with your schedule and the other trades on site.

Ventis provides new construction HVAC installation for builders, general contractors and owners building homes in Ocala and throughout Marion County. The work covers the full mechanical scope: load calculations, equipment selection, duct design, rough-in, trim-out, startup and commissioning.
A heating and cooling system is far easier to get right before the drywall goes up. Equipment locations, duct chases, return paths and condensate routes all compete with framing, plumbing and electrical for space. Planning them early avoids field fixes that cost airflow, efficiency and schedule days.
On a build, the HVAC contractor is one trade among many. What a superintendent needs is predictable: accurate takeoffs, clear communication about what the mechanical system needs from framing and electrical, and crews who show up when the schedule says they will.
We work from your plans and schedule, flag conflicts early and keep documentation ready for inspections and energy-code compliance. Before quoting, tell us about your plan set, energy compliance path, target equipment efficiency and any builder standards so the estimate reflects the actual scope.
Mechanical planning happens in stages that line up with construction milestones:
Load calculations, equipment selection and duct layout from the approved plans.
Ducts, line sets, condensate lines, platforms and control wiring installed after framing and before insulation and drywall.
Mechanical work is inspected while it is still visible.
Equipment, registers, grilles and thermostats are installed once finishes are in.
The system is charged, balanced and tested, then documented for final inspection and the owner.
A plan review looks for the details that cause problems in the field. Is there a central location for the air handler with service clearance? Do trusses or joists allow a trunk line to reach the far bedrooms? Is there a path for returns from closed-door rooms? Where will the condensate drain terminate, and where will the outdoor unit sit relative to windows, property lines and the electrical service?
We also look at insulation levels, window specifications and orientation, which feed directly into the load calculation.
ACCA Manual J calculates the sensible and latent heat gains and losses for each room and for the whole house. In Florida, the Building Code’s energy chapter requires equipment to be sized from Manual J (or another approved method) loads, calculated for the home’s actual orientation. Designer safety factors and allowances for future expansion are not permitted.
New homes are often tighter and better insulated than older ones, so their loads can be smaller than rules of thumb suggest. Getting that number right is what keeps a new home from being oversized and humid.
ACCA Manual S uses the Manual J loads and the manufacturer’s expanded performance data to pick equipment that meets both the sensible and latent load at local design conditions. Under Florida’s energy code, the selected cooling capacity can exceed the calculated total load by at most 15 percent unless the manufacturer offers no closer size, and heat pumps are held to that cooling-based cap as well. The code also directs designers away from nominal AHRI capacity and toward expanded performance data.
The ANSI-recognized standard for sizing residential duct systems is ACCA Manual D. The method uses the blower’s available static pressure, the equivalent length of each run including fittings, and the airflow each room needs to size trunks and branches. It also addresses flexible duct installation, since excess length, sag and compression reduce airflow significantly.
A Manual D design gives the installers a duct layout to follow, rather than leaving sizes to rules of thumb in the attic.
Rough-in is where mechanical, electrical and plumbing trades meet. Coordination items include:
Drywall sanding and floor finishing produce fine dust that can coat a new coil and blower in days. Duct openings and register boots should stay covered until finishes are complete. If the system has to run for drying or temporary comfort, use filtration at the returns and replace the filter before closing. A coil loaded with construction dust starts its life with reduced airflow, and the homeowner pays for it on every bill.
Register location affects comfort as much as duct size. Supply outlets are usually placed to wash windows and exterior walls, where heat gain is highest. Returns need enough area to keep velocity and noise low, and bedrooms with doors need a return path through a dedicated return, a jumper duct or a transfer grille.

For a split-system air conditioner going into a Florida home, DOE sets the floor at 14.3 SEER2 below 45,000 Btu/h of capacity, dropping to 13.8 SEER2 for bigger systems. Many projects choose higher-rated equipment as part of their energy compliance path or builder standards. Placing ducts and the air handler inside the conditioned space, where the design allows, also helps a great deal, because ducts in a vented attic lose energy through leakage and heat gain.
Heat pumps are a natural fit for new homes in Marion County. One system handles cooling and the mild heating season, and split heat pumps must meet federal minimums of 14.3 SEER2 and 7.5 HSPF2. Backup heat strips should be sized to the calculated heating load and the electrical design, not simply the largest kit available. New systems use lower-GWP refrigerants under current EPA rules, which affects line set and component choices.
Tighter new homes leak less air, which improves efficiency but means fresh air needs a planned path. Depending on the home’s construction and energy compliance path, mechanical ventilation may be required. Outdoor air brings moisture with it in a humid climate, so the ventilation strategy and the cooling equipment’s latent capacity need to be designed together. Some projects add a whole-home dehumidifier when cooling loads are low.
Mechanical work on new homes is permitted and inspected through the local building department, which is Marion County or the city the property sits in. The permit package typically includes the load calculation and equipment information that the energy code requires. Inspections usually happen at rough-in, before walls are closed, and at final. Clear documentation keeps those inspections moving.
Commissioning verifies that the installed system matches its design. It includes pressure testing and evacuating the refrigerant circuit, charging to the manufacturer’s targets, setting blower airflow, measuring static pressure, balancing room airflow, testing heat strips and safety controls, and confirming condensate drainage. The homeowner then gets a walkthrough of the thermostat, filter location and routine AC maintenance needs.
Custom homes bring their own considerations: tall ceilings, large glass walls, outdoor living spaces, detached workshops and multiple zones. Some spaces are better served by a separate system or a ductless mini-split for a casita or workshop. We work with owners, architects and builders to match the system to how the house will be used. For later service on any completed system, see our central air conditioning services.
Send the plan set, the energy compliance approach you are using and your target schedule, along with any equipment or efficiency standards you build to. We review the mechanical scope, note questions or conflicts we see in the plans and return an estimate that spells out what is included, from design documentation through rough-in, trim-out and commissioning.
For single custom homes, we are glad to meet with the owner and builder together. Decisions about zoning, equipment location and humidity control are easier to make when everyone hears the same tradeoffs at the same time.
Related Services
Keeping a new home’s system clean and performing to its startup readings.
Cooling for casitas, workshops and later additions.
Blower, coil and drain care for the indoor equipment.
An overview of residential cooling services from Ventis.
Service Areas
Builders and owners across Marion County can bring their plans to Ventis, from lots in Summerfield and Dunnellon to neighborhoods such as:
FAQ
As early as the plan stage. Load calculations and duct layouts depend on the plans, and decisions about air handler location, chases and return paths are much easier before framing. Bringing the HVAC contractor in early also helps the permit package, since Florida’s energy code requires sizing documentation for the equipment being installed.
A current plan set with elevations, window schedules and insulation specifications is the starting point. Helpful additions include the energy compliance approach, target equipment efficiency, preferred equipment brands, the air handler location, any zoning or ventilation requirements and the construction schedule. The more complete the information, the more accurate the estimate.
Square-foot rules ignore insulation, window area and orientation, air tightness and duct location, all of which vary widely in new construction. They often produce oversized equipment that cools quickly but removes little moisture. Florida code requires Manual J loads and Manual S selection instead, and it prohibits adding safety factors to the calculation.
It can, with a platform, service access, secondary drain protection and careful sealing. However, an air handler and ducts inside the conditioned space avoid attic heat gain and leakage losses. When the design allows an interior closet or a conditioned attic, it is usually worth considering. We review the options with the builder during plan review.
During rough-in, installers hang the trunk and branch ducts, set register boots, run refrigerant lines and control wiring, install condensate drains and build equipment platforms. This happens after framing and before insulation and drywall. The work is then inspected while it is still visible, and any corrections are made before the walls are closed.
Commissioning confirms the system works as designed. It includes evacuating and charging the refrigerant circuit to specification, setting and measuring blower airflow and static pressure, balancing room airflow, testing heat strips and safety controls, verifying drainage and documenting the results. The homeowner receives an explanation of controls and filter maintenance.
Ventis works with builders, general contractors and homeowners on new residential projects. Owner-builder projects need clear coordination on scheduling, permits and which trade handles each item. Contact us with your plans and timeline, and we can discuss the scope, the permit process and how the HVAC work fits into your schedule.
Not always. A properly sized system with enough latent capacity handles moisture in many new homes. Very efficient houses can have such small cooling loads that the air conditioner runs too little to dry the air, especially in spring and fall. When the design shows that risk, a whole-home dehumidifier tied into the duct system is worth pricing.
Send us your plans and schedule. We’ll review the mechanical scope, coordinate with your build and provide a detailed estimate.